[SMM Analysis] Analysis of Ternary Cathode Precursor Export Situation in February

Published: Mar 21, 2025 19:27
In February 2025, China's exports of ternary cathode precursor were 7,773 mt, down 16% MoM and 57% YoY. From March 2024 to February 2025, the cumulative exports of ternary cathode precursor (including NCM, NCA, nickel oxides, and NC) from China were 162,854 mt, with a cumulative YoY decline of 34%.

In February 2025, China's ternary cathode precursor exports were 7,773 mt, down 17% MoM and 57% YoY.

From March 2024 to February 2025, the cumulative exports of ternary cathode precursors (including NCM, NCA, nickel oxides, and NC) from China were 162,854 mt, a 34% decrease YoY.

In February, the overall export volume of ternary cathode precursors decreased compared to January, with NCM, NCA, and nickel oxides and NC all showing varying degrees of decline. The total exports of nickel oxides and NC in February were 2,243 mt, down 18% MoM and 64% YoY. NCA exports in February were 0 mt. Additionally, NCM exports in February totaled 5,530 mt, down 15% MoM and 52% YoY.

By country, South Korea remained the main destination for China's nickel oxides and NC exports in February, with its share increasing to 88%, although the export volume decreased from 2,244 mt last month to 1,968 mt. NCM exports to South Korea fell from 6,390 mt last month to 5,141 mt.

By province, regarding nickel oxides and NC, 2,243 mt were exported in February 2025, with Hunan Province exporting 1,860 mt, accounting for 83%, an increase in share from the previous month. Hubei Province's exports were 107 mt, a 41% decrease from the previous month.

For NCM, 5,530 mt were exported in February, with Zhejiang Province exporting 1,757 mt, a decrease from the previous month, and its share dropping from 45% to 32%. Jiangxi Province's exports also decreased, with its share falling from 29% to 18%.


SMM New Energy Research Team

Cong Wang 021-51666838

Lingying Zhang 021-51666775

Xiaodan Yu 021-20707870

Rui Ma 021-51595780

Ying Xu 021-51666707

Disheng Feng 021-51666714

Yujun Liu 021-20707895

Yanlin Lv 021-20707875

Ye Yuan 021-51595792

Zhizheng Zhou 021-51666711

Xianjue Sun 021-51666757

Ziya Lin 021-51666902

Linting Yang 021-51595835

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 hour ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
1 hour ago